What happens between your deposit and the day the machine runs — and who you call when it stops.

Sequence

From deposit to first pellet

01Drawing approvalLayout and interface drawing signed off before cutting
02ProductionOne slot, confirmed date, progress photos on request
03Load testRun with material, record motor current, video supplied
04PackingCrate or frame, rust preventive, spare-parts box
05DocumentsInvoice, packing list, B/L, CO, FORM E for ASEAN
06ShippingFOB Qingdao / Lianyungang, booking confirmed with you
07CommissioningRemote guidance or an engineer on site
08Spare partsExpress 5–7 days, matched by serial number

Every machine ships with the English manual, wiring diagram, spare-parts list and its own test record.

Support

When it stops

Reply timeWithin one working day by email or phone
Fault findingVideo call with the machine running; we ask for the current reading and the material condition
Spare partsWear parts by express in 5–7 days, matched to the serial number
On-site supportEngineer visit arranged when remote support is not enough; scope and cost agreed beforehand
WarrantyMain frame and drive components, per the sales contract; wear parts excluded

Before you call

Three things that speed it up

  • — The serial number on the nameplate
  • — A short video with the machine running (sound on)
  • — The material you are running and its moisture

Most issues we see are material or voltage related, not mechanical — the video usually shows which.

Need a commissioning plan?

Tell us the site conditions and we write the sequence before the machine ships.