Biomass Energy Equipment

Counter-flow Cooler

Pellets cool against a counter-flow of air, so the last tonne out is as cool as the first.

  • ✓Counter-flow air path: pellets cool evenly from top to bottom
  • ✓Rotary discharge valve meters pellets out at a steady rate
  • ✓Level sensor and automatic discharge (optional)

Overview

Hot pellets straight from the die are soft and sticky; they have to cool before they can be screened or bagged. A counter-flow cooler passes air upward against pellets falling downward, so every pellet meets air at roughly the same temperature difference and the last tonne out is as cool as the first. Cooling volumes of 1.5, 4 and 15 m³ cover small to large lines; larger silos are built to drawing. A rotary discharge valve meters pellets out at a steady rate instead of dumping them in slugs.

Technical specifications

Counter-flow Cooler

1.5 m³

Cooling volume1.5 m³
Adapted capacity2–3 t/h

4 m³

Cooling volume4 m³
Adapted capacity8–12 t/h

15 m³

Cooling volume15 m³
Adapted capacity20–25 t/h

Sized to the pellet mill output; larger silos are built to drawing. Discharge valve and control are quoted per installation.

Why this machine

Why this machine

  • →Counter-flow air path: pellets cool evenly from top to bottom
  • →Rotary discharge valve meters pellets out at a steady rate
  • →Level sensor and automatic discharge (optional)
  • →Sheet-steel body with inspection door

Applications

  • ·Pellet lines after the mill
  • ·Bagging lines
  • ·Feed pellets
  • ·Wood pellets for export

Capacity: 1.5–15 m³

FAQ

What buyers ask before ordering

为什么用逆流而不是简单料仓?

普通料仓里下面的料先凉、上面还热,最后一吨带着温度进袋会"出汗"。逆流让上下温差拉平。

我该选多大容积?

按颗粒机产量和颗粒需要的停留时间定。选型跟整线一起确认,不能只看容积数字。

能自动出料吗?

可以,料位传感器与自动出料是选配。标准版是手动旋转阀。

冷却要多久?

取决于颗粒直径和环境空气。停留时间由容积与出料速度在整线设计时确定。

Delivery & support

What happens after the order

Lead time 25–35 days for a single machine; 45–60 days for a complete line
Warranty 12 months on the machine; blades, screens, dies and bearings excluded
Packing Wooden case or pallet, shipping marks, moisture protection for sea freight
Factory checks Incoming material, welding and dimensions, test run with material, packing check — four gates
Documents English manual, wiring diagram, spare-parts list, test-run record

Need a price for this machine? Send the material and the tonnage you need — we reply within one working day.

Request a quote